Skip to content

General Manager – Cut to Pack & Operations

Muhammad Ijaz Anwar

General Manager, Cut to Pack & Operations. 23+ years running order-to-shipment execution at five leading manufacturers, from fabric readiness to final dispatch.

Muhammad Ijaz Anwar, General Manager – Cut to Pack & Operations

23+

years in textile

At a glance

Executive achievements.

  • 23+

    Years of progressive growth

  • 5

    Leading manufacturers

  • 13+

    Global apparel accounts

  • 27

    Customer brands named

Every figure comes from the CV or is counted from it. No percentages or results are estimated.

Why hire him

What he brings to a team.

  • Order-to-shipment ownership

  • Systems that hold on the floor

  • Buyer-ready quality

  • Cross-functional leadership

The journey

From the quality floor to General Manager.

Five manufacturers, twenty-three years, one thread: getting the right product, made right, out of the door on time.

Feb 2003 — May 2005

Needle Point (Pvt.) Ltd.

QMS Supervisor

  • Supervised inline and final inspections for export production; evaluated raw materials, trims, packaging and embellishments.
  • Handled technical correspondence with buying-office auditors and vendors; supported new-style and accessory approvals.

May 2005 — Dec 2018

Sapphire Fibers (Pvt) Limited

Deputy Manager

  • Managed customer quality requirements across 13+ global apparel accounts, coordinating with relevant teams to maintain product and fabric standards.
  • Conducted internal and self-audits and prepared compliance and performance reports for international buyers.

Customers

  • Russell Europe
  • B&C Collection

Dec 2018 — Jul 2020

Zephyr Textile (Pvt) Limited

Production Cut-to-Pack Manager

  • Coordinated cut-to-pack execution from fabric readiness and production handover through finished-goods packing and ex-mill dispatch.
  • Worked with marketing and merchandising to align fabric availability, order priorities, production flow and shipment dates.

Customers

  • B&C Collection
  • Sol’s

Nov 2020 — Nov 2022

Masood Textile Mills (Pvt) Limited

Senior Manager, QMS

  • Worked with manufacturing teams to prevent quality issues from disrupting production flow, customer requirements and shipment commitments.
  • Supported floor implementation of JIDOKA, KANBAN visibility, operator self-inspection, GEMBA walks and Total Line Stabilization (TLS).

Customers

  • The Children’s Place
  • Champs Sportswear

Nov 2022 — Present

W. Brothers Apparel

General Manager, Cut to Pack & Operations

  • Lead day-to-day production and cut-to-pack operations, converting order priorities and delivery dates into practical floor plans from material readiness through shipment.
  • Review order status, style complexity, capacity, manpower, machinery and line loading with production and planning teams; agree daily and weekly priorities and recovery actions.

Customers

  • JD
  • Ellesse

Customers

Brands he has delivered for.

  1. JD

  2. Ellesse

  3. Blank Essentials

  4. Jack

Also served

  • The Children’s Place
  • Foot Locker
  • JCPenney
  • Fruit of the Loom
  • PVH
  • Champs Sportswear
  • Lacoste
  • Russell Europe
  • Stanley & Stella
  • B&C Collection
  • Sol’s
  • ZUKI

Expertise

Fabric to dispatch, one flow.

  • Station 01 of 07

    Fabric & trims

    Securing fabric and trim readiness with stores, procurement and merchandising, and signing off dye batches for shade, GSM and appearance, so approved material is ready before bulk production.

    Watch forShortages, late approvals and specification changes can interrupt cutting or sewing.

    • Dye-batch approvals
    • Shade matching, GSM, appearance
    • Material & trims readiness
  • Station 02 of 07

    Sampling & approvals

    Coordinating proto, size-set, pre-production and cut-to-pack seal-sample approvals so every team works to confirmed specifications.

    • Sampling & pre-production approvals
    • Pre-production & shipment-readiness reviews
  • Station 03 of 07

    Cutting

    Overseeing cutting and bundle movement, with disciplined material utilization and reduced handling and rework.

    • Cut-to-pack control
    • Material utilization
    • JIT inventory practices
  • Station 04 of 07

    Sewing

    Balancing line loading against capacity and manpower, and stabilizing the lines with JIDOKA, KANBAN, GEMBA walks and Total Line Stabilization (TLS).

    Watch forLine loading that outruns capacity and manpower.

    • Production planning & line balancing
    • JIDOKA, KANBAN, GEMBA
    • Total Line Stabilization (TLS)
  • Station 05 of 07

    Finishing

    Monitoring WIP, output and bottlenecks through finishing, and tracking rework, wastage and line efficiency against daily targets.

    Watch forBottlenecks, rework and wastage against daily targets.

    • Efficiency, wastage & cost control
    • Root-cause analysis, CAPA follow-up
  • Station 06 of 07

    Packing

    Aligning production, planning, technical/quality and logistics on specifications, packing instructions and shipment readiness.

    • Packing instructions
    • Trims, packaging, sampling
    • Product-safety checks
  • Station 07 of 07

    Dispatch

    Linking material readiness to shipment performance, escalating delays early to protect on-time ex-mill delivery.

    Watch forDelays, escalated early to protect on-time ex-mill delivery.

    • Order-to-shipment execution
    • On-time delivery
    • Daily cross-functional meeting

The floor, mapped

One thread from fabric to dispatch.

Hover, tap or tab to a zone to read what happens there.

  1. Fabric & trims. Securing fabric and trim readiness with stores, procurement and merchandising, and signing off dye batches for shade, GSM and appearance, so approved material is ready before bulk production.
  2. Sampling & approvals. Coordinating proto, size-set, pre-production and cut-to-pack seal-sample approvals so every team works to confirmed specifications.
  3. Cutting. Overseeing cutting and bundle movement, with disciplined material utilization and reduced handling and rework.
  4. Sewing. Balancing line loading against capacity and manpower, and stabilizing the lines with JIDOKA, KANBAN, GEMBA walks and Total Line Stabilization (TLS).
  5. Finishing. Monitoring WIP, output and bottlenecks through finishing, and tracking rework, wastage and line efficiency against daily targets.
  6. Packing. Aligning production, planning, technical/quality and logistics on specifications, packing instructions and shipment readiness.
  7. Dispatch. Linking material readiness to shipment performance, escalating delays early to protect on-time ex-mill delivery.
1Fabric & trims2Sampling & approvals3Cutting4Sewing5Finishing6Packing7Dispatch

Select a zone on the floor plan to see its station.

The toolbox

Everything needed to take an order from fabric to dispatch.

  • 01

    Core expertise

    • Order-to-shipment execution
    • Cut-to-pack control
    • Production planning & line balancing
    • Material & trims readiness
    • Sampling & pre-production approvals
    • Efficiency, wastage & cost control
    • Floor leadership & HSE
    • Cross-functional leadership
  • 02

    Manufacturing methods

    • Lean Manufacturing
    • JIDOKA, KANBAN, GEMBA
    • Total Line Stabilization (TLS)
    • JIT inventory practices

Education

Built on a solid foundation.

  1. Bachelor of Arts (B.A.)

    Multan Board

    1996–2000

  2. Intermediate (F.A.)

    Multan Board

    1994–1995

  3. Matriculation

    Multan Board

    1993–1994

Languages

Speaks the industry's languages.

  • Aa

    English

    • Spoken
    • Written
  • اردو

    Urdu

    • Spoken
    • Written

Contact

Let’s talk.

For hiring conversations and business enquiries, reach out directly or take the CV with you.